1.Main Facility
GWS has one slipway of 25000DWT and two dry docks of 25000DWT and 60000DWT,and equips one crane of 400T,one crane of 200T,two crane of 100T, six numerical control cutter, heart treatment workshops, and other workshops, equipments and facilities.
Equipment name |
L×W×H |
DWT |
Crane |
Slipway |
190×28m |
25000 |
100t×2sets |
No.1 Dock |
240×36×9.5m |
60000 |
400t×1set
36t×2sets |
No.2 Dock |
237×28×11.2m |
25000 |
200t×1set
40t×1set
10t×2sets
15t×1set |
No.1Assembling Wharf |
152×5.5m |
25000 |
30t×1set
25t×1set
15t×1set |
No.2Assembling Wharf |
200×5.5m |
25000 |
25t×1set |
No.3Assembling Wharf |
110×5.0m |
10000 |
10t×1set
36t×set |
2.Main Facility Pic
|

|
|
|
|
No.1 Dock |
|
No.2 Dock |
|
|
|
|
|
Slipway |
|
Wharf |
|
|
|
|
|
Steel Pretreatment Line |
|
NC Cutter |
|

|
|
|
|
160t Truck |
|
Welding Platform |
|
|
|
|
|
400t Fuel Tank |
|
400t NC Tourtuous Machine |
|